PMFHousing in action: building projects

References by PMFHousing: building projects in PMF timber construction

Since 2020, PMFHousing has realised buildings of every size with PMFTechnology – from the prototype at RWTH Aachen through single-family homes and a day café to a housing development with 23 units. What all projects have in common: the building elements are made in the PMFHousing factory, and the shell stands on site within a few days.

The projects at a glance

Modular construction: The PMF Cubes housing development in Inden was completed in 2024 – 23 move-in-ready units and two central buildings for refugees, built to GEG 2020 and approved for permanent occupancy. The BüroCube in Aachen shows the same principle on a small scale: a 36 m² functional building for a commercial client.

Public buildings: For a public client, PMFHousing built a 190 m² Spielhaus (play center) in Mönchengladbach to the KfW Efficiency House 40 standard; the building shell stood within three days.

Custom buildings: The single-family home in Monschau (60 m², GEG 2024) was assembled into a shell in two days; the family home near Stade (approx. 130 m²) has a five-metre-high living room with a sleeping gallery. The Florabar in Düsseldorf, a 74 m² day café, stood as a shell after two days.

Information on building standards and funding is available from the Federal Institute for Research on Building, Urban Affairs and Spatial Development (BBSR).

All references at a glance